Commissioning and Design Assistance

Building Envelope Commissioning is a process for developing systems and criteria that meets defined objectives that are measurable and verifiable and interface with all aspects of a building's performance. This includes performance criteria, quality control and durability. The building envelope commissioning process can begin before the schematic design phase of a project, continuing throughout design and construction into the operational phase of a building.
Building Envelope Commissioning services for glazing, exterior walls, waterproofing and roofing may include:
Pre Design Phase
-
Identify desired performance metrics.
-
Assess site or existing building conditions as they relate to the building envelope.
Schematic Phase:
-
Project Meetings: Attend design team kick-off meetings and any required subsequent project meetings.
-
Building Code Review: Review local codes and site requirements as they relate to the exterior building envelope.
-
Design Criteria: Develop appropriate design criteria for wind, water, seismic and other environmental hazards.
-
Schematic Design Review: Provide preliminary review comments.
-
Cost Estimates: Provide square foot estimates for building envelope items.
Design Development Phase:
-
Design Development Sketches and Details: Consult to develop details, sections and drawings, as required.
-
Outline Specifications: Assist with the preparation of a set of Outline Specifications, identifying basic performance requirements and generic material types.
-
Project Meetings: Attend design team project meetings as required.
-
Peer Review of design development documents to verify compatibility with performance requirements.
-
Cost Estimates: Assist with the preparation of budget construction cost estimates for exterior building envelope components.
Construction Documents Phase:
-
Assist with Development of Working Drawings.
-
Assist with the Development of Specifications: Assist with the completion of specifications. Recommend appropriate materials, manufacturers and performance criteria.
-
Fifty Percent Review: Comprehensive review of plans and specifications at fifty percent of completion with written comments and suggestions, as required.
-
Ninety Percent Review: Comprehensive review of plans and specification at ninety percent of completion with written comments and suggestions, as required.
-
One Hundred Percent Review: Comprehensive review of plans and specifications at one hundred percent completion with written comments and suggestions, as required.
-
Project Meetings: Attend design team project meetings as required.
-
Cost Estimates: Assist with the preparation of final construction cost estimates for exterior building envelope components.
Bidding and Negotiation Phase:
-
Review Proposals: Review relevant building envelope subcontractor proposals to verify they are in compliance with the project documents and provide written comments as required.
-
Value Engineering Proposals: Review and analyze value engineering proposals for building envelope components and provide written comments and recommendations.
-
Review Subcontractor Qualifications: Research and qualify prospective subcontractors for major building envelope components, including verification of past performance on similar projects and checking references within the industry.
-
Project Meetings: Attend pre-bid and pre-award project meetings, as required.
Construction Phase (Administration):
-
Witness Mock-ups and Tests: We will observe the construction of laboratory mock-ups and test specimens and witness laboratory testing to verify constructability and compliance with the project requirements.
-
Review Submittals: We will review contractor submittals required by the project documents for building envelope components and provide written comments.
-
Respond to RFI's: We will review and respond to relevant RFI's to help provide the requested information.
Construction Phase (Quality Control):
These services are often provided directly to the Owner or Construction Manager.
-
Change Order Review: Provide review and comments for Change Order requests, as required.
-
Site Inspections: Conduct periodic site inspections to review the quality of work and check for conformance with the project requirements. We provide a written report upon completion of each inspection.
-
Moisture Surveys to verify building interiors are dry during the construction process and at completion.
-
Field Water and Air Infiltration Tests: Conduct field tests of representative glazing and wall system assemblies to verify acceptable performance. We use ASTM E 1105 test method for water infiltration tests and ASTM E 547 for air infiltration tests.
-
Project Meetings: We will attend and participate in project meetings at the site, as required.
Building Operations Phase:
-
Training of Building Operations Professionals to review warranty obligations, maintenance requirements and quality control checks.
-
Warranty Inspections (typically at 11 months) of building envelope systems and components including glazing, waterproofing, sealants and roofs to verify performance.
-
Moisture survey to confirm building interiors are still dry.
-
Continuing inspections and training to insure durability and performance of systems.